During production, assigning a person to a task helps to streamline processes. As a result of assigning personnel to specific work orders, each order will be thoroughly reviewed. 

This approach results in strategic planning, which improves company productivity. By assessing each employee’s talents and knowledge, the manager can assign the right person to a certain work area, enhancing overall productivity.

Manufacturing Setting

After that, choose the work center from the configuration menu. Use the new button to create a new one. 

Work Centers

Include the following information when creating a new work center: Center name, tag, alternative work centers, code, working hours, and company name. On the General Information page, there is an option to enable the required login. 

To enable this option, the user will see a new field labeled Allowed employees. The employees listed there are those assigned to this work center; the user can specify which employees to include in this selection. 

These employees are in charge of supervising all orders completed in this work center. The cost per hour field allows users to enter the cost per hour for each employee who worked at the work center.

Beth Evans and Dories Cole can now work at Assembly Line 1, a newly developed labor center. These individuals increase the price by $200 per hour. Now, save.

Work Centers Record

This employee must log in before operations may begin. As a result, the user must provide each employee with a login password. This can be completed in the employee's module. 

It is important to choose the employee module. The overview displays each employee of the business. Open the employee module by choosing it from the list.

Employees

When a user gets to the first employee and selects the HR settings tab, there is a space to enter a PIN. Include Beth Evans’ employee login details there. 

Employees enter login details

Next, launch the second employee and enter the PIN code under the HR settings. 

Employee PIN Code

Bill of Materials

Let us start by creating a new bill of materials for the manufacturing of the product. After selecting a product, include the components and procedures. 

This BoM was designed specifically for use in the cotton-producing process. The raw materials serve as the components in this case.

BOM Record

The tasks are conducted on Assembly Line 1, a previously set work center. There are two other methods: spinning and ginning. Keep the BOM protected. 

BOM Record Operations

The work orders are completed on Assembly Line 1 of this work location. Suppose for a moment that Beth Evans should work for Ginning, the first operation. 

In addition, the employee Dories Cloe must be present for the second operation. To accomplish this, create a new production order. To start a new one, go to the operations menu and click Manufacturing Orders. 

After adding the Cotton product, select the freshly prepared Bill of Materials. When you select the right BoM, every action and component is instantly recreated. We are currently verifying the production order.

Manufacturing Orders

Once the order has been validated, go to the work order tab. There, you’ll notice that the second operation is in the waiting stage, awaiting the completion of the first operation, whilst the first operation is ready. 

Manufacturing Orders work Orders Tab

To finish the manufacturing process, use the mark as Done option. Following that, a smart tab titled cost analysis will emerge on the finished manufacturing order. This displays the entire cost of the manufacturing order. 

Cost Analysis

The cost Analysis Report presents operational and component costs individually. When examining operating costs, work center and employee costs can be displayed separately. 

Cost Operations

Beth Evans was working in the spinning and ginning departments. Thus, Beth Evans' cost per hour and total hours worked equal $23.87.The second employee, Doris Cole, costs $3.21.Thus, the employee's total cost is $27.08.

The Work center will cost you $71.23 in total. The total operating cost in this example is $98.32.

A qualified person will be assigned to supervise an activity that will streamline the production process. Odoo 17 now includes this feature, which helps to enhance productivity.


There are no comments for now.

Protected by reCAPTCHA, Privacy Policy & Terms of Service apply.
Sign in to leave a comment
How Does Odoo 17 Use Customer & Security Lead Times for Precise Sales Delivery?
How Does Odoo 17 Use Customer & Security Lead Times for Precise Sales Delivery?